Sequence of well drilling part 1 | PPT

Author: Shirley

Jan. 06, 2025

6 0 0

Sequence of well drilling part 1 | PPT

  • 1. 1 Eng. El Sayed Amer Well drilling Sequence of
  • 2. Eng. El Sayed Amer
  • 3. 3 Eng. El Sayed Amer Page 3 Schedule Time frame managing Exploration introduction THE Drilling SITE Drilling Rig Running CSG Casing CMT Basic logging
  • 4. 4 Eng. El Sayed Amer
  • 5. 5 Eng. El Sayed Amer
  • 6. 6 Eng. El Sayed Amer
  • 7. 7 Eng. El Sayed Amer Exploration and Geophysics
  • 8. 8 Eng. El Sayed Amer
  • 9. 9 Eng. El Sayed Amer
  • 10. 10 Eng. El Sayed Amer
  • 11. 11 Eng. El Sayed Amer Seismic survey
  • 12. 12 Eng. El Sayed Amer
  • 13. 13 Eng. El Sayed Amer
  • 14. 14 Eng. El Sayed Amer
  • 15. 15 Eng. El Sayed Amer
  • 16. 16 Eng. El Sayed Amer Let the Story Begin
  • 17. 17 Eng. El Sayed Amer THE Drilling SITE01 Once the location for the site has been established, the area is prepared for drilling, with the following steps: 1. Site Preparation 2.Conductor-rathole-mousehole 3. Transporting Equipment
  • 18. 18 Eng. El Sayed Amer THE Drilling SITE01 1. Leveling & site preparation
  • 19. 19 Eng. El Sayed Amer THE Drilling SITE01 2. Cellar digging &#; A dug-out area, &#; located below the rig. &#; The cellar serves as a cavity in which the casing spool and casing head reside.
  • 20. 20 Eng. El Sayed Amer THE Drilling SITE01 2. Cellar digging
  • 21. 21 Eng. El Sayed Amer THE Drilling SITE01 3. Mud pit digging
  • 22. 22 Eng. El Sayed Amer THE Drilling SITE01 3. Mud pit digging
  • 23. 23 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering Conductor Hole A large diameter hole bored to facilitate steel pipe. May be cemented in place to allow conventional oil and gas well drilling operations ,and also allows fluid returns to a mud system when drilling surface hole. CONDUCTOR PIPE INSTALLATION 30&#; OD x 1&#;. wall thickness has been selected and Affiliate&#;s standard for world-wide exploration and development drilling activities Pile Hammers &#; Diesel pile hammers are used for surface driving operations of conductor pipe. &#; The driving depth of the conductor pipe is a function of the sediments in the ground. &#; The most common used system is a hammer weight of 18t
  • 24. 24 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 25. 25 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering Drive Shoe Technology
  • 26. 26 Eng. El Sayed Amer THE Drilling SITE01 5. Rathole drilling Conductor pipe Rat-hole mouth hole
  • 27. 27 Eng. El Sayed Amer THE Drilling SITE01 5. Rathole drilling &#; Rathole A shallow bored hole under the derrick substructure in which the Kelly is temporarily stored during tripping operations. &#; Mouse Hole A shallow bored hole under the derrick substructure in which a single drill pipe joint is temporarily set to facilitate easier connections.
  • 28. 28 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 29. 29 Eng. El Sayed Amer THE Drilling SITE01 4. Conductor pipe hammering
  • 30. 30 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 31. 31 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 32. 32 Eng. El Sayed Amer 1. Rig Move Drilling Rig02
  • 33. 33 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 34. 34 Eng. El Sayed Amer 2. Rig up Drilling Rig02 a. Mast Raising
  • 35. 35 Eng. El Sayed Amer 2. Rig up Drilling Rig02 b. substructure Raising
  • 36. 36 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 37. 37 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 38. 38 Eng. El Sayed Amer 2. Rig up Drilling Rig02
  • 39. 39 Eng. El Sayed Amer 3. Conductor connection Drilling Rig02 Shaker line
  • 40. 40 Eng. El Sayed Amer 4. Rig Acceptance Drilling Rig02 Rig acceptance checklist Rig accept
  • 41. 41 Eng. El Sayed Amer 5. Pipe rack Drilling Rig02
  • 42. 42 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02
  • 43. 43 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02 Thread cleaning
  • 44. 44 Eng. El Sayed Amer 6. Drill Pipe Inspection Drilling Rig02 Thread cleaning
  • 45. 45 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 46. 46 Eng. El Sayed Amer 7. Stands make up Drilling Rig02 &#; Single pipe &#; Stand &#; 3 singles &#;
  • 47. 47 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 48. 48 Eng. El Sayed Amer 7. Stands make up Drilling Rig02
  • 49. 49 Eng. El Sayed Amer 8. Rack back stands Drilling Rig02
  • 50. 50 Eng. El Sayed Amer 9. BHA preparation Drilling Rig02 BHA &#; Run a 26" bit + 3 x 9" DC + HW-DP &#; Run a 26" bit + float valve + 36" Hole Opener + 1 x 9" Monel DC + 1 x 9" Spiral DC + 5" HWDP + 5" DPs Drill Bit Drill Collers Heavyweight Drill pipe Hole Opener Bit sub
  • 51. 51 Eng. El Sayed Amer 9. BHA preparation Drilling Rig02
  • 52. 52 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03 &#; Spud mud Mud used to drill a well from surface to a shallow depth. Guar gum or salt gel are commonly used offshore as spud mud. Onshore spud mud is usually a water-base mud containing bentonite clay that is flocculated with lime. MUD SYSTEM SEAWATER & SPUD MUD Mud Density 8.9 &#; 12.0 ppg Rheology @ 120°F/49°C PV 13 &#; 15 cps YP 24 &#; 32 lb/100 sqft Gels 11/15- 10/20 lb/100 sqft
  • 53. 53 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03
  • 54. 54 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03 Mixing
  • 55. 55 Eng. El Sayed Amer 1. Preparing spud mud Spud Mud03
  • 56. 56 Eng. El Sayed Amer 2. Spud In Spud Mud03 A large diameter hole is drilled using a large diameter drill bit. Drilling is conducted by heavy duty industrial strength drill bits. The drill bits come in different sizes according to the diameter of the hole being drilled.
  • 57. 57 Eng. El Sayed Amer 2. Spud In Spud Mud03 &#; First, a large drill bit is used to drill a short interval of hole.
  • 58. 58 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 59. 59 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 60. 60 Eng. El Sayed Amer 2. Spud In Spud Mud03 1. Mud pumping 2. Mud cleaning Mudreturnline
  • 61. 61 Eng. El Sayed Amer 2. Spud In Spud Mud03
  • 62. 62 Eng. El Sayed Amer 2. Spud In Spud Mud03 Drill to the depth of the first two joints using high viscosity mud (80-120 seconds Funnel viscosity) and at a very slow pump rate,
  • 63. 63 Eng. El Sayed Amer 2. Mud Cleaning Spud Mud03
  • 64. 64 Eng. El Sayed Amer 3. Continue drilling Spud Mud03 26&#; conductor pipe 20&#; pit diameter 36&#; conductor pipe 30&#; pit diameter
  • 65. 65 Eng. El Sayed Amer 4. Hole Cleaning Spud Mud03 1. Mud pumping 2. Mud cleaning Mudreturnline
  • 66. 66 Eng. El Sayed Amer 5. Wiper trip for hole cleaning Spud Mud03 At TD circulate the hole clean, displace the hole with gel mud Eng. Elsayed Amer Eng. Elsayed Amer
  • 67. 67 Eng. El Sayed Amer 6. POOH Running CSG04
  • 68. 68 Eng. El Sayed Amer 7. surface Casing Running 04 Running CSG
  • 69. 69 Eng. El Sayed Amer 7. surface Casing Running Spud Mud Running CSG
  • 70. 70 Eng. El Sayed Amer
  • 71. 71 Eng. El Sayed Amer 7. surface Casing Running 03 Float show and float coaller 04 Running CSG
  • 72. 72 Eng. El Sayed Amer 7. surface Casing Running Spud Mud Running CSG
  • 73. 73 Eng. El Sayed Amer 7. surface Casing Running Spud Mud03 Surface casing 04 Running CSG
  • 74. 74 Eng. El Sayed Amer
  • 75. 75 Eng. El Sayed Amer
  • 76. 76 Eng. El Sayed Amer
  • 77. 77 Eng. El Sayed Amer
  • 78. 78 Eng. El Sayed Amer
  • 79. 79 Eng. El Sayed Amer 8. Casing Cementing Spud Mud Cementing Cement functions Provides zonal isolation. Supports axial load of casing. Protects casing against corrosion and erosion 1 2 3 Provides support to borehole in plastic or unconsolidated formations 4
  • 80. 80 Eng. El Sayed Amer 8. Casing Cementing Spud Mud Cementing Drilling Fluid Spacer Fluid Bottom Plug Shoe Joint Top Plug Cement A B C Float Shoe Float Collar Bottom Plug Ruptured Top Plug Released Plug Bumped Displacement Fluid
  • 81. 81 Eng. El Sayed Amer 9. Wait on cement Spud Mud Cementing To suspend drilling operations while allowing Cement slurries to solidify, harden and develop compressive strength
  • 82. 82 Eng. El Sayed Amer 10. Cement Job completion Spud Mud Cementing

Contact us to discuss your requirements of Down-The-Hole Drilling Tools. Our experienced sales team can help you identify the options that best suit your needs.

Additional reading:
What Is a Bucket Adapter and How Does It Work?

If you are looking for more details, kindly visit PDC Drill Bit.

KSQ Technology contains other products and information you need, so please check it out.

Comments

0

0/2000