Login

Your Name:(required)

Your Password:(required)

Join Us

Your Name:(required)

Your Email:(required)

Your Message :

2024 Buyer's Guide: Foundation Drilling Rigs

Author: becky

Apr. 29, 2024

45 0 0

2024 Buyer's Guide: Foundation Drilling Rigs

What is foundation drilling?

Foundation drilling is, in essence, using big machines to put big holes in the ground.

Want more information on hydraulic drilling rig? Feel free to contact us.

Most residential homes have a reinforced, concrete slab foundation poured on top of the ground. Though some settling and shifting will occur, it is not enough to send the walls tumbling down. However, huge structures like bridges and office buildings, need foundations that can handle some movement and are strong enough to carry the weight of the building itself and what’s on or inside of it. To do this, large construction projects use foundation drilling rigs to create drilled shafts. Also known as drilled piers, caissons or bored piles, drilled shafts are constructed by pouring concrete into a drilled hole. The load is supported mainly through skin friction where the subsurface soil surrounding the shaft holds it in place. End-bearing shafts carry the weight load on the base of the shaft. This type of drilled shaft is used less often.

The type of rig used depends on several factors. How deep and what the diameter of the holes will be, obviously. But, the type of soil, where the project is located (in a city or out in the boonies), and how much room there is to maneuver are just some of the considerations. The project requirements will also dictate which foundation drilling method is used.

These are the most common drilling methods:

Kelly Drilling 

Kelly drilling is a dry rotary drilling method. It is used to make bored piles with a large diameter, typically over 500mm. It’s is popular because it works for most types of rock and soil. A key part of this method is the telescopic drill rod – also known as the Kelly bar.

Continuous Flight Auger Drilling 

Continuous flight auger drilling is another dry rotary method. It uses rotation of a continuous flight auger to displace soil.  The auger needs to be the same length as the hole that will be drilled. This makes it a good solution for predrilling.

Double Rotary Drilling 

Double rotary drilling combines continuous flight auger drilling with a continuous casing. This method is used for challenging soil conditions or sensitive environments. Drill cuttings are ejected from an opening in the top of the auger.

If you want to learn more, please visit our website humanized design Hydraulic DTH Drilling Rig.

Additional reading:
Drill Pipe Considerations

Full Displacement Drilling 

Full displacement drilling is used for cast-in-place piles. The surrounding soil is only displaced and virtually no drill cuttings are brought to the surface. A smooth casing is used and fitted with a displacement body at the lower end.

Grab Drilling 

Grab drilling is the oldest of the dry drilling methods. Soil is loosened by cutting or impact driving. This method is typically used for well drilling or cast-in-place piles.

Reverse Circulation Drilling 

Reverse circulation drilling can produce boreholes of about 3.2m diameter. The method is useful in challenging soil conditions such as karst. This method uses the mammoth pump principle. The flushing drill fluid rises inside the drill rod and brings the drill cuttings to the surface.  This technique can be used for soil or rock drilling.

Down-the-Hole Drilling 

For very hard rock or to break up boulders, the down-the-hole drilling method is used. A hammer is mounted on the drill bit at the end of the drill rod. Compressed air is used to pneumatically break and remove the rock or boulders. The bit breaks up the rock by rotating and impacting at the same time. The compressed air moves the loosened drill cuttings to the surface.

No matter the method, there is a foundation drilling rig available to put those big holes in the ground, in the right place, at the right depth.

How to Choose the Best Equipment for Geological Drilling

The fifth step is to choose the right drilling contractor for your project. A drilling contractor is a company that provides the drilling equipment and personnel for your project. Drilling contractors can offer different levels of service, ranging from providing only the drilling rig and the drill crew, to providing the complete package of drilling equipment, accessories, fluids, and ancillary services. You should consider several factors when selecting a drilling contractor, such as their experience, reputation, safety record, quality assurance, technical support, and pricing. You should also review the terms and conditions of the contract and ensure that they cover all the aspects of your project, such as the scope of work, the deliverables, the liabilities, the warranties, and the dispute resolution.

For more Low operation cost DTH Drilling Riginformation, please contact us. We will provide professional answers.

Comments

0

0/2000