Profitable Manufacturing Business–Stone crusher plant
Profitable Manufacturing Business–Stone crusher plant
A success story of profitable stone crusher plant
For more information, please visit our website.
Is it beneficial to open a sand and gravel plant? Whether large or small, demand exceeds supply in the current sand and gravel market. It can be seen from the smiling introduction of a person in charge of mining project that the stone aggregates production plant business is very good. It is understood that he bought the "four-year mining rights" of a stone mine from other bosses at the end of , which means that within these four years, he can mine according to his own ability, and any profit or loss will be considered his own. After three years, the boss Take back. The investor spent 60 million to buy the mining rights of the mine, and also invested 40 million to build a sand and gravel plant, including mining gravel equipment, sand making equipment, transport vehicles, site construction, etc. (This project is a large-scale mining gravel production line, for a general small one (one million is enough).
After six months, the site was completed, the equipment was installed and ready for production. Three years minus half a year, time is tight and the task is heavy. Someone asked how much money can be earned from stone crushing plant in a year? Can the investment cost be recovered? The crushing plant has an annual output of 5 million tons of sand and gravel aggregate. According to market statistics, the average price of local sand and gravel is 80 rmb/ton. The cost of producing one ton of sand and gravel is about 20 rmb/ton, and the net profit of one ton is 60 rmb.
Total profit in three years: 30 (month)*(/12)*60=
How much can you earn from stone mining in a year: usually more than 700 million RMB in 30 months, and up to more than 200 million RMB in a year
1.How much can you earn from stone mining in a year?
How much does it actually cost to build a machine-made sand plant? This consists of several expenditures, such as raw materials, land, water and electricity during operation, labor, sand making equipment and other investments. Among them, generally those who want to build a stone crushing plant have raw material resources, and land fees, water and electricity fees, labor costs, etc. can be budgeted based on local prices. As for the investment in equipment cost, the production process flow must be designed based on the raw materials properties. In addition, the equipment is divided into fixed crusher plant and mobile stone crushing and screening plant. The fixed type are cheaper, while mobile crushing plant are relatively expensive but more flexible. Uers can choose according to their own needs.
From the sharing of the above customers, we can roughly understand that investing in a sand and gravel production plant with an annual output of 5 million tons (own mining rights) and earning 200 million per year is not a dream. Of course, not everyone can open a large-scale mine gravel production plant. Most of them produce about 100 tons per hour. So how much money can small-scale stone mining make in a year? Specifically analyze from the following points:
1.Do you own the stone mine or buy it?
If you buy a fixed-term property right for stone mining, there will be a greater investment cost. Of course, in this case, a large-scale gravel production line will usually be established to mine as much as possible and strive to earn more.;
2.How many tons of annual output should be achieved in 2 years?
The cost of gravel is mostly fixed, and now it is necessary to compare the output. Although there will be equipment maintenance costs, they are only a drop in the bucket. An annual output of 5 million tons can earn more than 200 million a year. Producing 500,000 tons makes at least 1,000 to more than 20 million a year;
The cost of sand and gravel aggregates is not much different, and the proportion of daily maintenance costs is also small, but capacity has a greater impact on the profit. The annual output is 5 million tons, and the annual income can reach more than 200 million RMB. Produce 500,000 tons, at least 1,000 RMB to more than 20 million RMB a year;
3.Is the gravel equipment smarter?
The better the equipment, the higher the production efficiency. An intelligent gravel crusher machine can increase production efficiency by 60%, so the correct efficient crushing equipment is important.
2. How much does a stone crusher cost? What equipment is needed?
The price of investing in a set of mining gravel machinery and equipment ranges from 20,000 to 300,000 to tens of millions RMB. There are many capacity with different crushing equipment and the prices vary greatly. The following are several common stone crusher plant and equipment quotations:
Plan 1: Complete stone crusher plant with capacity 30- 50 t/h
Investment cost: about USD$70-$90 thousand dollars
Equipment configuration: jaw crusher PE400X600 + impact crusher PF + vibrating screen 3YK + belt conveyor;
Plan 2: Complete stone crusher plant with capacity 80-100 t/h
Investment cost: about USD$95-$150 thousand dollars
Equipment configuration: jaw crusher PE500X750 + impact crusher PF+ vibrating screen 3YK + belt conveyor;
Plan 3: Complete stone crusher plant with capacity 200-300 t/h
Investment cost: about USD$200-$400 thousand dollars
Equipment configuration: PE900* jaw crusher + PF impact crusher + 4YK vibrating screen + transmission belt
Plan 4: Complete stone crushing plant 500tph
Investment cost: about USD$380 thousand dollars
Equipment configuration: jaw crusher PEX + PF impact crusher (2 units) + 3YK vibrating screen (2 units)
The above four investment plans are designed for medium and low hardness materials, such as limestone, gypsum, bluestone, marble, etc. When crushing high-hardness materials such as granite and basalt, a cone crusher can be selected for the second-stage medium crushing, and the wear-resistant parts are high It is made of manganese steel and has a long service life. What specific equipment should be used? The main production equipment is as follows:
1. Jaw crusher : coarse crushing, large feed opening
The indispensable part of the mining crusher is the jaw crusher, which can coarsely crush the stone. The feed particle size can reach less than mm, with a large crushing ratio and high output.
Goto Zoneding machine to know more.
2. Impact crusher : medium crushing, good grain shape of finished product
As the second-stage secondary crushing equipment, it adopts impact crushing, which has uniform particle size and good shaping effect. It is cube-shaped and the finished product can reach 0-30mm. A vibrating screen is required to screen out materials of different specifications.
3. Cone crusher : medium crushing, large output
It is also suitable for secondary crushing. Cone crushing is more suitable for harder materials (basalt, granite...). It adopts the laminated crushing principle. The rolling mortar wall moves toward the crushing wall to squeeze the material. It can handle particle sizes 400mm. The discharge is adjusted by a hydraulic motor. The mouth and adjustment operation are easy, and the range is 3-60mm. The price is slightly more expensive, but the wearing parts have a long service life.
Professional manufacturers provide you with a complete crushing and screening equipment
Are you still worried about choosing mining crusher equipment? Here we recommend Henan Baichy Machinery Manufacturer. Baichy Manufacturer is a large enterprise with more than 20 years of development in China. It not only provides a complete set of mining crusher equipment, but also supports "tailor-made" production lines, including equipment model customization, scheme design, site planning, and construction. Factory procedures, material testing, installation and commissioning, technical training, etc., Baichy services are available in every corner. If you need it, you can consult online and serve you 24 hours a day.
People Also Frequently Asked For-FAQ:
Is stone crusher an industry?
Stone Crushing Industry is an important industrial sector in the country engaged in producing crushed stone of various sizes depending upon the requirement which acts as raw material for various construction activities such as construction of Roads, Highways, Bridges, Buildings, Canals etc.
What are the benefits of stone crusher?
A rock crusher makes the transportation process more manageable by breaking the materials into smaller pieces. After crusher treatment, more excess stone, brick or concrete will fit into a dump truck. As a result, your workers will be able to transport waste in fewer trips so they can move on to the next job.
What is a crusher plant?
A Crushing plant is one-stop crushing installation, which can be used for rock crushing, garbage crushing, building materials crushing and other similar operations. Crushing plants may be either fixed or mobile. A crushing plant has different stations (primary, secondary, tertiary, ...)
How much is the mining equipment market worth?
The global mining equipment market size was valued at USD 112.23 billion in and is projected to grow from USD 114.61 billion in to USD 151.25 billion by , exhibiting a CAGR of 4.0% during forecast period. It is from: https://www.fortunebusinessinsights.com/mining-equipment-market-
Share To
How much investment is needed to start a stone crusher?
Starting a stone crusher requires a significant investment of time, money, and effort. The machinery involved in the process can be expensive, and the cost of operation can quickly add up. However, with careful planning and research, it is possible to start a successful business in this industry.
The first step in starting a stone crusher is to conduct a thorough market analysis. This will help you determine the demand for crushed stone in your area, as well as the competition you will face. You should also research the prices of raw materials, such as stone, sand, and gravel, and the cost of transportation and delivery.
Once you have a clear understanding of the market and the costs involved, you can start to create a business plan. This plan should include a detailed financial analysis, including the initial investment required, the projected revenue and expenses, and the expected profit margin. You should also outline your marketing strategy, including how you will reach your target audience and promote your business.
When it comes to the actual equipment needed to start a stone crusher, there are a few key pieces of machinery that are essential. These include a primary crusher, a secondary crusher, and a screening machine. The primary crusher is used to break down large rocks into smaller, more manageable pieces, while the secondary crusher is used to further refine the material. The screening machine is used to separate the crushed stone into different sizes.
The cost of this equipment can vary widely depending on the size and capacity of the machinery you need. A small-scale operation may be able to get by with just a single crusher and a screening machine, while a larger operation may require multiple crushers and screening machines, as well as other specialized equipment.
In addition to the cost of equipment, you will also need to factor in the cost of land, building materials, and labor. Depending on your location, you may also need to obtain permits and licenses from local or state authorities, which can add to the overall cost.
Overall, the total investment required to start a stone crusher can range from a few hundred thousand dollars to several million dollars. The exact amount will depend on a variety of factors, including the size and scale of your operation, the cost of equipment and materials, and the cost of labor and other expenses.
While starting a stone crusher can be a significant investment, it can also be a lucrative business opportunity for those who are willing to put in the time and effort. By conducting thorough research, creating a solid business plan, and investing in the right equipment, you can set yourself up for success in this industry.
Contact us
Related Links
For more Stone Crusher Machineinformation, please contact us. We will provide professional answers.
Comments
0